There is no single answer to “how much does villa renovation cost in Dubai” — and any company that gives you one number without seeing your villa is guessing. The real cost depends on the size of your villa, its current condition, how much of the layout you want to change, the quality of materials you choose, and how much electrical, plumbing and air-conditioning (MEP) work is needed behind the walls.

Based on current 2026 Dubai market data, most villa renovations fall somewhere between AED 150 per sq ft for a light cosmetic refresh and AED 1,000+ per sq ft for a premium, fully custom renovation. A typical mid-size villa (3,000–4,000 sq ft) undergoing a full interior renovation usually lands between AED 600,000 and AED 1.5 million, though smaller cosmetic jobs can start around AED 150,000 and large structural transformations can run well past AED 3 million.

These figures are indicative market ranges, not a quotation. The only way to get an accurate number for your villa is a site visit, where a contractor can see the existing condition, measure the actual built-up area, and understand exactly what you want done.

GET A FREE VILLA RENOVATION ESTIMATE

Zale Interior offers a free site visit, free consultation, free quotation, and free sample selection at your doorstep for villa renovation projects across Dubai, Sharjah and Ajman.

GET A FREE VILLA RENOVATION ESTIMATE

Villa Renovation Cost in Dubai in 2026: At a Glance

Villa renovation isn’t one product with one price — it’s a spectrum of scopes. The table below breaks down the main categories used across the Dubai renovation market in 2026.

Renovation typeTypical scopeUsually includedOften excludedIndicative budget range
Cosmetic refreshPainting, minor repairs, fixture swaps, light flooring touch-upPaint, basic patching, minor fixture replacementNew kitchen/bathroom layouts, MEP changesAED 150,000 – 350,000
Partial renovationOne or two focus areas overhauled (e.g. kitchen + bathrooms) plus common-area cosmetic workNew kitchen or bathrooms, flooring in select rooms, painting throughoutFull-villa flooring, structural or major MEP workAED 250,000 – 650,000
Full interior renovationEvery room touched: flooring, kitchen, all bathrooms, ceilings, painting, joineryFlooring, kitchen, bathrooms, ceilings, lighting, joinery, painting, MEP touch-upsStructural changes, extensions, major façade workAED 600,000 – 1,500,000
Premium / luxury renovationFull renovation with imported materials, custom joinery in every room, designer finishesEverything above plus premium brands, smart-home wiring, bespoke furnitureStructural extensions unless specifiedAED 1,200,000 – 2,800,000
Major structural transformationLayout changes, extensions, wall removal, extensive MEP rerouting, external worksStructural work, full MEP redesign, external/landscaping worksNothing — this is the most comprehensive tierAED 2,000,000 – 4,000,000+

These ranges are cross-checked against several current Dubai renovation market sources rather than copied from a single guide, and they still vary widely between sources. That variation comes down to real differences in scope, finish quality, villa size, MEP condition, whether structural work is involved, external works, community or developer requirements, design and consultancy fees, authority approvals, VAT, and whether furniture and appliances are included. There is no single “official” Dubai renovation price — only ranges shaped by what is actually being done.

Want an accurate number for your villa? Book a free site visit and we’ll walk through your space with you.

Contact us for villa renovation

How Much Does Villa Renovation Cost Per Square Foot in Dubai?

Per-square-foot pricing is a useful starting point, but it has real limits. Based on current 2026 market data:

  • Cosmetic refresh: roughly AED 150 – 300 per sq ft
  • Partial to full renovation: roughly AED 300 – 750 per sq ft
  • Premium and luxury renovation: roughly AED 750 – 1,100 per sq ft
  • Major structural work: often AED 1,100 per sq ft and up, depending heavily on the scope

The first limitation is built-up area versus plot area. Renovation costs are calculated against the built-up (internal floor) area of the villa, not the size of the land it sits on. If you’ve seen a “plot size” figure in your title deed, that number is almost always larger than the actual renovated floor area.

The second limitation is that two villas with the same built-up area can cost very differently to renovate. A 4,000 sq ft villa with outdated wiring, old plumbing and water damage will cost more to renovate than a 4,000 sq ft villa in good structural condition — even if both end up with the same finishes. A villa where you’re keeping the existing layout will almost always cost less than one where you’re moving walls, relocating a kitchen, or extending a room.

This is exactly why a contractor needs to inspect the villa before giving a final quotation. A per-sq-ft figure quoted over the phone is a starting estimate at best.

 

A simple example calculation

Suppose your indicative renovation budget is AED 350 per sq ft for a full interior renovation, and your villa has a built-up area of 4,000 sq ft.

4,000 sq ft × AED 350 = AED 1,400,000 (before VAT, contingency, and any external works)

This example is for budgeting purposes only. It is not a Zale Interior quotation, and your actual cost could be lower or higher depending on condition, materials, and scope.

Not sure which materials fit your budget? Request a free consultation and sample selection and we’ll help you plan a realistic number before you commit to anything.

 

Villa Renovation Cost by Villa Size

Villa size gives you a rough starting range, but it should always be read alongside the scope tables above — a 5,000 sq ft villa getting a cosmetic refresh will cost far less than a 3,000 sq ft villa getting a premium renovation.

Villa sizeIndicative budget rangeWhat this typically represents
2,000 sq ftAED 150,000 – 900,000Small villa or townhouse; range spans cosmetic refresh to premium finishes
3,000 sq ftAED 220,000 – 1,300,000Common 3-bedroom size; range spans partial to premium renovation
4,000 sq ftAED 300,000 – 1,800,000Common 4-bedroom size; range spans partial to premium renovation
5,000 sq ftAED 400,000 – 2,300,000Larger 4–5 bedroom villa; wider gap between mid-range and premium
6,000 sq ftAED 500,000 – 2,800,000Large family villa; often includes more external and MEP work
8,000+ sq ftAED 700,000 – 4,000,000+Large or luxury villas; structural and premium scopes become more common

Size alone does not determine cost. A smaller villa with extensive structural changes can easily cost more than a larger villa that only needs a cosmetic refresh. Think of these ranges as a starting point for budgeting, not a substitute for a site visit.

About Zale Interior

Villa Renovation Cost by Bedroom

Homeowners often search by bedroom count because it’s an easy way to describe a villa, but bedroom count is one of the weaker predictors of renovation cost. Here’s why, and what to consider instead.

3-bedroom villa: Usually 2,500–3,800 sq ft built-up area. Budgeting should focus on how many bathrooms are attached, whether the kitchen is being fully replaced, and whether flooring is being changed throughout or only in living areas.

4-bedroom villa: Usually 3,500–5,000 sq ft. The jump from 3 to 4 bedrooms often adds a bathroom or two and more flooring and painting area, which tends to matter more for cost than the extra bedroom itself.

5-bedroom villa: Usually 4,500–6,500 sq ft. At this size, homeowners more often add a maid’s room, a larger kitchen, or additional living spaces into the renovation scope, which increases both material and labour cost.

6-bedroom villa: Usually 6,000+ sq ft. These villas frequently include external areas, multiple staircases, and larger MEP systems, all of which add cost beyond what bedroom count alone would suggest.

The honest answer is that built-up area and actual scope matter far more than bedroom count. Two 4-bedroom villas can differ in renovation cost by hundreds of thousands of dirhams depending on their layout, condition and finish level.

What Is Included in a Full Villa Renovation?

A full villa renovation typically touches every major system and surface in the home. Here’s what each category involves and how cost can vary within it.

Flooring

Flooring choice has a big impact on both material and installation cost. Common options in Dubai villas include SPC (stone plastic composite) flooring, LVT/vinyl, porcelain or ceramic tiles, natural stone, and engineered or solid wood flooring. SPC and LVT tend to sit at the more budget-friendly end and suit high-traffic areas well, while natural stone and premium wood sit at the higher end. Installation cost also varies with subfloor preparation, especially in older villas where the existing floor needs levelling before new flooring goes down.

Explore our flooring services

Kitchen Renovation

Kitchen cost is driven by cabinet material and finish, countertop choice (laminate, quartz, granite, or natural stone), backsplash, hardware, sink and tap fittings, appliances, lighting, and any plumbing or electrical rerouting needed if the layout changes. A kitchen that keeps its existing footprint is almost always cheaper than one where the sink, cooker point, or overall layout is being moved.

Bathrooms

Bathroom renovation cost depends on tile selection, sanitaryware quality, shower area design (built-in niches, glass partitions, rain showers), waterproofing, plumbing, vanity units, mirrors and lighting. Waterproofing in particular is not an area to cut cost on — poor waterproofing in an older villa is one of the most common causes of repeat repairs and hidden damage later.

Wall Panels and Wall Finishes

Wall finishes now go well beyond paint. Options include PVC and WPC panels, MDF panelling, fluted panels, acoustic panels, wallpaper and decorative finishes. These are popular for feature walls in living rooms, bedrooms and TV units, and pricing varies significantly by material and design complexity.

Explore our wall panels and finishes services

False Ceilings and Lighting

Gypsum ceilings, feature ceilings, LED strip lighting, spotlights and indirect lighting are now standard in most mid-range and premium villa renovations in Dubai. Cost depends on the complexity of the ceiling design and the number of lighting circuits and fixtures required.

Custom Joinery and Furniture

Custom joinery — wardrobes, TV wall units, consoles, kitchen cabinetry and additional storage — is often one of the largest line items in a villa renovation budget. Cost depends heavily on material (melamine, veneer, lacquer), hardware brand, and the complexity of the design.

Explore our custom furniture services · Explore our TV wall unit services

Painting

Painting cost is affected by surface preparation (especially in older villas with cracks or old paint layers), primer requirements, number of coats, paint brand and finish, and any feature walls with specialist finishes. Proper preparation takes more time but gives a noticeably better and longer-lasting result.

Electrical, Plumbing, AC and Other MEP Work

MEP work can swing a renovation budget more than any other single factor, especially in older villas. Outdated wiring that needs full replacement, old plumbing that needs re-piping, and AC systems that need upgrading or relocating all add real cost that isn’t always visible until a contractor inspects the villa. This is one of the main reasons two quotes for the “same” renovation can look very different — one contractor may have priced for full MEP replacement and the other may not have inspected behind the walls at all.

External Works

Outdoor flooring, façade finishes, boundary walls, landscaping, pergolas and pool-related work are often treated as a separate budget line, and for good reason — external works can add a significant amount to a project and are easy to underestimate. If your renovation includes any outdoor scope, make sure it’s clearly and separately itemised in your quotation, not folded into a vague “external works” allowance.

Room-by-Room Villa Renovation Budget

AreaMajor cost driversTypical work involvedWhat to ask your contractor
Living roomFlooring, ceiling design, wall finishes, joineryFlooring replacement, false ceiling, feature wall, TV unitIs the TV unit custom-built or off-the-shelf? What flooring is quoted?
BedroomsFlooring, wardrobes, paintingFlooring, built-in wardrobes, painting, lightingIs wardrobe interior fit-out (drawers, shelving) included?
KitchenCabinets, countertop, appliances, plumbing/electrical changesCabinet replacement, countertop, backsplash, plumbing reworkAre appliances included or is this a shell-only quote?
BathroomsWaterproofing, tiles, sanitaryware, vanityTiling, waterproofing, sanitaryware, vanity, shower enclosureIs waterproofing tested before tiling? What’s the sanitaryware brand?
EntranceFlooring, lighting, feature finishesFlooring, ceiling detail, entry door if applicableIs the main door included or excluded?
StaircaseFlooring/cladding material, railing, lightingStair cladding, handrail, under-stair lighting or storageIs the railing material and finish specified?
Outdoor areasFlooring, landscaping, façade, boundary wallOutdoor tiling, planting, pergola, external paintIs this priced separately from the interior scope?
Maid’s room / service areasFlooring, painting, basic fittingsBasic flooring, painting, wardrobe or storageIs this included in the headline quote or an add-on?

What Factors Affect Villa Renovation Cost in Dubai?

Twenty factors consistently influence the final number on a villa renovation quotation:

  1. Villa size — larger built-up area generally means more material and labour.
  2. Existing condition — older villas often need more remedial work before finishes go in.
  3. Structural changes — moving or removing walls adds engineering, approval and construction cost.
  4. Electrical work — full rewiring costs significantly more than reusing existing circuits.
  5. Plumbing — re-piping an older villa is a major cost driver, especially for bathrooms and kitchens.
  6. AC/MEP — replacing or relocating AC units and ductwork can be one of the largest hidden costs.
  7. Flooring material — SPC and LVT cost less than natural stone or premium wood.
  8. Kitchen specification — cabinet material, countertop choice and appliance grade all move the price.
  9. Bathroom specification — sanitaryware brand and tile choice have a wide price range.
  10. Custom joinery — bespoke wardrobes and units cost more than standard modular options.
  11. Wall finishes — panelling and decorative finishes vary widely by material.
  12. Ceiling and lighting — complex gypsum designs and layered lighting cost more than a flat ceiling with basic fixtures.
  13. Doors and windows — replacement versus refurbishment makes a real difference.
  14. External works — landscaping, façade and boundary work are often underestimated.
  15. Design requirements — bespoke design and 3D visualisation add professional fees.
  16. Authority approvals — permit and NOC costs and timelines vary by scope.
  17. Community/developer requirements — some communities have their own approval processes and fees.
  18. Project location — access, parking and community rules can affect labour logistics and cost.
  19. Material brands — imported and branded materials cost more than local equivalents.
  20. Workmanship and project management — proper site supervision and quality control have a cost, but they protect you from expensive rework later.

Want to understand how these factors apply to your villa specifically? WhatsApp us your villa size and requirements for a free consultation.

Why Villa Renovation Quotes in Dubai Can Be Very Different

If you’ve asked two or three contractors for a quote and gotten very different numbers, you’re not imagining it. This is one of the most common — and most frustrating — parts of renovating in Dubai, and it almost always comes down to what’s actually inside the number, not how “expensive” a contractor is.

Common reasons quotes differ:

  • Different scope — one quote may cover flooring and painting only, while another includes kitchen and bathrooms too.
  • Different material specifications — “tiles” and “porcelain tiles” and “imported porcelain tiles” are three different price points.
  • Exclusions — a lower quote may simply exclude items a higher quote includes, like appliances or external works.
  • MEP assumptions — one contractor may have inspected the wiring and plumbing; another may be assuming it’s in good condition.
  • Joinery quality — melamine, veneer and lacquer finishes have very different costs for what looks similar in a rendering.
  • Number of coats and preparation — proper surface prep and multiple paint coats cost more but last longer.
  • Waterproofing — proper waterproofing (and testing it before tiling) adds cost but prevents future leaks.
  • Waste removal — demolition debris and waste disposal should be a line item, not an afterthought.
  • Site protection — protecting existing finishes, flooring and furniture during work has a real cost.
  • Project management — dedicated site supervision affects both quality and price.
  • Design fees — some quotes include design and drawings; others charge separately.
  • Approvals — permit and NOC processing time and fees vary.
  • VAT — always check whether the quoted figure is inclusive or exclusive of VAT.
  • Contingency — a quote with no contingency built in may look attractive until unexpected costs appear mid-project.

The lesson here is simple: don’t compare final totals — compare itemised quotations. A lower number with vague line items is a bigger risk than a slightly higher number that’s fully broken down.

What Should Be Included in a Villa Renovation Quotation?

Use this checklist when reviewing any villa renovation quotation, including one from us:

  • Project scope, clearly described
  • Drawings or design references
  • Materials specified by type and brand
  • Labour cost, separated from materials where possible
  • Demolition
  • Waste disposal
  • Site protection
  • MEP (electrical, plumbing, AC) scope
  • Joinery specification
  • Painting scope and number of coats
  • Flooring type and area
  • Ceiling design
  • Lighting fixtures and quantity
  • Testing (waterproofing, electrical) before handover
  • Cleaning before handover
  • Handover process
  • Warranty terms, if offered
  • Payment schedule
  • Project timeline
  • Exclusions, stated explicitly
  • VAT treatment (inclusive or exclusive)
  • Authority or community approvals, where applicable

A quotation that covers these points clearly is far less likely to surprise you with hidden costs partway through the project.

Have your villa size and requirements ready? WhatsApp us for a free, itemised quotation.

Do You Need Approval or Permits for Villa Renovation in Dubai?

This depends entirely on what work you’re doing — not every renovation needs a Dubai Municipality permit.

Cosmetic work such as painting, flooring replacement, or swapping fixtures generally does not require a building permit. Work that involves structural modifications, extensions, demolition, or certain changes to the building’s approved layout is more likely to require approval, because it affects the structure or the building’s original approved drawings.

Dubai Municipality’s Building Permits department handles permit issuance, technical inspections and completion certificates for residential villas as one of its core categories. You can review the official process here: Dubai Municipality — Building Permit Steps.

On top of any Dubai Municipality requirement, many villa communities have their own developer or community rules — for example, some master developers require an NOC before any renovation work starts, regardless of whether the work needs a municipal permit. This applies to a number of well-known Dubai communities and can affect timelines, so it’s worth checking with your community or developer early.

Approval requirements can vary according to the property, location, scope and authority. Confirm the applicable requirements before starting work.

zale interior Gypsum & Glass Partitions

How Long Does a Villa Renovation Take in Dubai?

Timelines vary considerably depending on scope, but a typical full villa renovation moves through these stages:

  1. Site inspection
  2. Design and planning
  3. Quotation
  4. Material selection
  5. Approvals, where applicable
  6. Demolition
  7. MEP work
  8. Ceiling and wall work
  9. Flooring installation
  10. Joinery installation
  11. Painting
  12. Final installations (lighting, fixtures, appliances)
  13. Snagging
  14. Final handover

A cosmetic refresh can sometimes be completed in a few weeks. A full interior renovation more commonly takes a few months from start to handover, and custom joinery lead times or authority approvals can extend the programme further. We don’t promise a fixed timeline until we’ve seen the scope — anyone who gives you an exact number of weeks before inspecting your villa is guessing, the same as with cost.

How to Reduce Villa Renovation Costs Without Sacrificing Quality

Reducing cost doesn’t have to mean reducing quality. A few practical ways to keep your budget in check:

  • Prioritise high-impact areas — kitchens and bathrooms tend to matter most for both daily life and resale value.
  • Choose materials carefully — SPC and LVT flooring can look excellent at a fraction of natural stone’s cost.
  • Keep the existing layout where practical — avoiding structural changes saves significantly on engineering and construction cost.
  • Avoid unnecessary structural changes — only move walls or change layouts where there’s a real functional reason to.
  • Compare itemised quotations, not just final totals.
  • Select durable materials — cheaper materials that need replacing sooner can cost more over time.
  • Plan before demolition — changing your mind mid-project after walls are already open is one of the most expensive mistakes homeowners make.
  • Order custom joinery early — joinery often has the longest lead time in a renovation.
  • Avoid last-minute design changes — these are a common source of both delays and cost overruns.
  • Ask for samples before approving materials — seeing a physical sample avoids costly mismatches between expectation and reality.

We’re not going to tell you to simply pick the cheapest contractor — the cheapest quote is often the one missing the most line items.

How to Choose a Villa Renovation Company in Dubai

Before signing with any villa renovation contractor, check:

  • Relevant licence and credentials for construction/fit-out work
  • Real completed projects you can see or verify
  • A clear, written quotation — not a verbal estimate
  • A written scope of work
  • Material specifications by name and brand, not just “tiles” or “paint”
  • A realistic project timeline
  • A clear payment schedule
  • Warranty terms, in writing
  • Responsive, clear communication
  • Site supervision arrangements
  • References or reviews you can actually verify
  • Evidence of safety practices and workmanship quality
  • Transparent exclusions — what’s not included, stated plainly

Questions worth asking before you sign: Who will supervise the site day to day? What happens if MEP issues are found once work starts? What’s the payment schedule tied to — milestones or dates? What exactly is excluded from this quote?

Is It Better to Renovate the Whole Villa or One Area at a Time?

Full renovation means completing the entire scope in one continuous project. This is usually more efficient — one mobilisation, one timeline, less disruption spread over a long period — and can work out more cost-effective per square foot because materials, labour and site setup are consolidated.

Phased renovation means tackling one area at a time (kitchen this year, bathrooms next, for example). This spreads the financial cost over a longer period and can be useful if you’re living in the villa during the work, but it usually costs more overall because you’re mobilising a team multiple times, and prices may change between phases.

A phased approach can make sense when your budget genuinely can’t cover the full scope at once, when you want to test a contractor’s quality on a smaller project first, or when only certain areas urgently need work. For most homeowners planning a significant renovation, a single well-planned project tends to be the more efficient route.

Explore our villa renovation services

Example Villa Renovation Budget

Illustrative example only — not a Zale Interior quotation.

For a hypothetical 4,000 sq ft villa undergoing a full interior renovation with a total budget of AED 1,000,000:

CategoryIndicative allocation
FlooringAED 120,000
KitchenAED 150,000
BathroomsAED 120,000
PaintingAED 40,000
Ceiling and lightingAED 90,000
Wall finishesAED 60,000
Custom joineryAED 180,000
MEP (electrical, plumbing, AC)AED 140,000
External worksAED 60,000
Contingency / otherAED 40,000
TotalAED 1,000,000

Your own allocation will look different depending on which areas matter most to you, your existing condition, and your material choices. This example is purely for illustrating how a budget is typically distributed — it is not based on an actual completed project.

Frequently Asked Questions About Villa Renovation Cost in Dubai

1. How much does villa renovation cost in Dubai in 2026?

Most villa renovations range from around AED 150,000 for a cosmetic refresh to well over AED 2 million for a premium or structural renovation. The exact figure depends on size, condition, scope and materials, and needs a site inspection to confirm.

2. How much does villa renovation cost per square foot in Dubai?

Indicative 2026 market ranges run from roughly AED 150–300 per sq ft for cosmetic work up to AED 1,000+ per sq ft for premium or luxury renovation. Per-sq-ft pricing is a starting point, not a final number.

3. What is the cheapest way to renovate a villa in Dubai?

Keep the existing layout, avoid structural changes, choose cost-effective materials like SPC or LVT flooring, and focus your budget on high-impact areas like the kitchen and bathrooms rather than spreading it thin across everything.

4. How much does it cost to renovate a 3-bedroom villa in Dubai?

It depends heavily on built-up area and scope, but many 3-bedroom villas (typically 2,500–3,800 sq ft) see renovation budgets somewhere in the AED 250,000–1,300,000 range depending on tier. A site visit gives an accurate number.

5. How much does it cost to renovate a 4-bedroom villa in Dubai?

4-bedroom villas (typically 3,500–5,000 sq ft) commonly see budgets in the AED 300,000–1,800,000 range depending on scope and finish level, again confirmed only after inspection.

6. How much does it cost to renovate a 5-bedroom villa in Dubai?

5-bedroom villas (typically 4,500–6,500 sq ft) often involve larger kitchens, extra bathrooms or a maid’s room, pushing budgets into the AED 400,000–2,300,000+ range depending on tier.

7. Is kitchen renovation included in a full villa renovation?

Yes, a full villa renovation normally includes the kitchen — cabinets, countertop, backsplash, fittings and often appliances — but always confirm this explicitly, since some quotes treat the kitchen as a separate line item or exclude appliances.

8. How much does flooring cost during villa renovation?

It varies by material — SPC and LVT are more budget-friendly, porcelain and ceramic tiles sit in the middle, and natural stone or premium wood are at the higher end. Installation cost also depends on the condition of the existing subfloor.

9. Do I need approval for villa renovation in Dubai?

Not always. Cosmetic work generally doesn’t need a permit, but structural changes, extensions or demolition usually do. Some communities also have their own NOC requirements. Confirm with Dubai Municipality and your community before starting.

10. How long does villa renovation take in Dubai?

A cosmetic refresh can take a few weeks; a full interior renovation more commonly takes a few months. Custom joinery lead times and any required approvals can extend the timeline.

11. Should I renovate before moving into a villa?

Many homeowners prefer to renovate before moving in, since it avoids working around furniture and daily life. It’s not a requirement, but it’s often more efficient if your timeline allows for it.

12. How can I compare villa renovation quotations?

Compare itemised scope, not just the final total. Look at material specifications, what’s excluded, MEP assumptions, and whether VAT and contingency are included.

13. Does villa renovation cost include VAT?

UAE VAT is currently 5% and generally applies to most goods and services, which typically includes construction and fit-out work. Always confirm with your contractor whether a quoted figure is inclusive or exclusive of VAT, and check current guidance from the Federal Tax Authority if you need certainty for your specific situation.

14. Can I renovate only my kitchen, bathrooms or living room?

Yes. Partial renovations focused on specific rooms are common and can be a practical way to manage budget, especially if the rest of the villa is in reasonable condition.

15. How can I get an accurate villa renovation quotation?

Book a site visit. An accurate quotation needs your villa’s actual built-up area, current condition, desired scope and material preferences — none of which can be assessed reliably over the phone.

Get a Free Villa Renovation Consultation and Quotation in Dubai

An accurate villa renovation estimate depends on understanding your villa’s size, current condition, the rooms you want renovated, your material preferences, your design requirements, and any structural or MEP work involved. That’s not something that can be priced responsibly without a proper look at the property.

Zale Interior offers a free site visit, free consultation, free quotation, and free sample selection at your doorstep for villa renovation and interior fit-out projects across Dubai, Sharjah and Ajman — including flooring, wall panels, curtains and blinds, custom furniture, wardrobes, TV wall units, kitchen cabinetry, false ceilings, lighting, wall finishes and joinery.

Book Your Free Villa Site Visit Get Your Free Renovation Quotation WhatsApp Zale Interior

Phone: +971 56 118 4910 WhatsApp: https://wa.me/971561184910 Website: https://zaleinterior.com Email: info@zaleinterior.com Facebook & Instagram: @zaleinterior

Sources and references

Note: Figures in this article are indicative market estimates based on current 2026 Dubai renovation industry sources, not official government pricing, and not a Zale Interior quotation. Actual costs depend on site inspection.